Curriculum
- 12 Sections
- 141 Lessons
- 7 Days
Expand all sectionsCollapse all sections
- INTRODUCTION5
- Overview of IT Project Management4
- DE23
- 3.11.1 The Basics of Six Sigma
- 3.21.1.1 Meanings of Six Sigma
- 3.31.1.2 General History of Six Sigma & Continuous Improvement
- 3.41.1.3 Deliverables of a Lean Six Sigma Project
- 3.51.1.4 The Problem Solving Strategy Y = f(x)
- 3.61.1.5 Voice of the Customer, Business and Employee
- 3.71.1.6 Six Sigma Roles & Responsibilities
- 3.81.2.1 Defining a Process
- 3.91.2 The Fundamentals of Six Sigma
- 3.101.2.2 Critical to Quality Characteristics (CTQ’s)
- 3.111.2.3 Cost of Poor Quality (COPQ)
- 3.121.2.4 Pareto Analysis (80:20 rule)
- 3.131.2.5 Basic Six Sigma Metrics
- 3.141.3 Selecting Lean Six Sigma Projects
- 3.151.3.2 Developing Project Metrics
- 3.161.3.1 Building a Business Case & Project Charter
- 3.171.3.3 Financial Evaluation & Benefits Capture
- 3.181.4 The Lean Enterprise
- 3.191.4.1 Basics of Lean
- 3.201.4.3 Lean & Six Sigma Integration
- 3.211.4.2 History of Lean
- 3.221.4.5 5S – Straighten, Shine, Standardize, Self-Discipline, Sort
- 3.231.4.4 The Seven Elements of Waste
- Risk Management Planning and Identifying Risks3
- MEASURE15
- 5.1Process Mapping (As-Is Process)
- 5.2Data Attributes (Continuous Versus Discrete)
- 5.3Defining Metrics
- 5.4Measurement System Analysis
- 5.5Gage Repeatability And Reproducibility
- 5.6Data Collection Techniques
- 5.7Calculating Sample Size
- 5.8Data Collection Plan
- 5.9Understanding Variation
- 5.10Measuring Process Capability
- 5.11Calculating Process Sigma Level
- 5.12Rolled Throughput Yield
- 5.13Measurement Phase Review
- 5.14Statistical Software Training
- 5.15Visually Displaying Baseline Performance
- Analysis Fundamentals3
- ANALYZE24
- 7.13.1 Patterns of Variation
- 7.23.1.1 Multi-Vari Analysis
- 7.33.1.2 Classes of Distributions
- 7.43.2 Inferential Statistics
- 7.53.2.1 Understanding Inference
- 7.63.2.2 Sampling Techniques & Uses
- 7.73.2.3 Central Limit Theorem
- 7.83.3 Hypothesis Testing
- 7.93.3.1 General Concepts & Goals of Hypothesis Testing
- 7.103.3.2 Significance; Practical vs. Statistical
- 7.113.3.3 Risk; Alpha & Beta
- 7.123.4 Hypothesis Testing with Normal Data
- 7.133.4.1 1-sample & 2 sample t-tests
- 7.143.4.2 One-Way ANOVA
- 7.153.4.3 Two-Way ANOVA
- 7.163.5 Hypothesis Testing with Non-Normal Data
- 7.173.5.1 Mann-Whitney
- 7.183.5.2 Kruskal-Wallis
- 7.193.5.3 Mood’s Median
- 7.203.5.4 Friedman
- 7.213.5.5 1 Sample Sign
- 7.223.5.6 1 Sample Wilcoxon
- 7.233.5.7 One and Two Sample Proportion
- 7.243.5.8 Chi-Squared (Contingency Tables)
- Analysing and Prioritising Risk7
- IMPROVE25
- 9.14.1 Simple Linear Regression
- 9.24.1.1 Correlation
- 9.34.1.2 Regression Equations
- 9.44.1.3 Residuals Diagnostics Analysis
- 9.54.2 Multiple Regression Analysis
- 9.64.2.1 Non-Linear Regression
- 9.74.2.2 Multiple Linear Regression
- 9.84.2.3 Confidence & Prediction Intervals
- 9.94.2.4 Residuals Diagnostics Analysis
- 9.104.2.5 Data Transformation, Box Cox Technique
- 9.114.3 Designed Experiments
- 9.124.3.1 Experimental Objectives
- 9.134.3.2 Experimental Methods
- 9.144.3.3 Experiment Design Considerations
- 9.154.4 Full Factorial Experiments
- 9.164.4.1 2k Full Factorial Designs
- 9.174.4.2 Linear & Quadratic Mathematical Models
- 9.184.4.3 Balanced & Orthogonal Designs
- 9.194.4.4 Fit, Diagnose Model and Center Points
- 9.204.5 Fractional Factorial Experiments
- 9.214.5.1 Designs
- 9.224.5.2 Confounding Effects
- 9.234.5.3 Experimental Resolution
- 9.244.6 Advanced Experiments
- 9.254.6.1 Steepest Ascent Analysis
- Risk Response Planning5
- CONTROL21
- 11.15.1 Lean Controls
- 11.25.3.1 Control Methods for 5S
- 11.35.3.2 Kanban (Pull Systems)
- 11.45.3.3 Poka-Yoke (Mistake Proofing)
- 11.55.2 Statistical Process Control (SPC)
- 11.65.4.1 Data Collection for SPC
- 11.75.4.2 I-MR Chart
- 11.85.4.3 Xbar-R Chart
- 11.95.4.4 U Chart
- 11.105.4.5 P Chart
- 11.115.4.6 NP Chart
- 11.125.4.7 Xbar-S Chart
- 11.135.4.8 CumSum Chart
- 11.145.4.9 EWMA Chart
- 11.155.4.10 Control Methods
- 11.165.3 Six Sigma Control Plans
- 11.175.6.1 Cost Benefit Analysis
- 11.18EXAM DAY ON THE LAST DAY
- 11.195.6.2 Elements of the Control Plan
- 11.20EXAM DAY ON THE LAST DAY
- 11.215.6.3 Elements of the Response Plan
- Construction Phase6
